Separate process heat from electrical motor loads, and daytime production from night shifts. Dust and lint affect cleaning plans. Confirm safe access and roof corrosion before choosing module layouts.
Namakkal · Rasipuram · Andagalur Gate · Tiruchengode · Paramathi Velur · Kumarapalayam · Pallipalayam · Mohanur · Senthamangalam · Kolli Hills · surrounding villages; final site/service availability is confirmed after review.
FREE PLANNING ESTIMATE
Solar for your electricity usage
Capacity (roof/load constrained)
2.5 kWEstimated installation range
₹1,12,500 – ₹1,62,500Verified subsidy estimate
₹0Estimated net investment
₹1,37,500Expected monthly generation
319 kWhPotential monthly savings
₹2,044Potential annual savings
₹24,528Simple payback after maintenance
5.9 yearsEstimated monthly EMI
2,921Required roof area
250 sq ftNominal battery requirement
0.0 kWhUnconstrained energy target
2.5 kWPlanning estimates only—not a guarantee of generation, subsidy, savings or returns.
Net yield 4.2 kWh/kWp/day; 365-day annualisation; roof allowance 100 sq ft/kW; indicative PV cost ₹45,000–₹65,000/kW; battery ₹18,000/nominal kWh. These are editable illustrative assumptions, not a quotation.
Bill-based estimates use bill ÷ your entered tariff, not a verified tariff schedule. Self-consumed energy is valued at your entered avoidable tariff; export credit is excluded. Fixed/demand electricity charges, roof strengthening and component replacements are excluded. Taxes are excluded from this illustrative installation range. Battery uses 80% discharge and 90% conversion efficiency; do not include backup with on-grid only. Payback deducts annual maintenance but is not discounted ROI. Subsidy is not an upfront payment promise; bridge finance may be needed.
No current subsidy rule has been verified for this section; subsidy is not deducted. Check official eligibility.
Services & project assessments
Planned service scope; availability is confirmed for your enquiry.
Residential rooftop solar →
Use a full year of electricity bills, not the highest summer bill alone. Inspect roof ownership, usable shade-free area, water tanks and access. Domestic subsidy eligibility is checked separately from installation cost.
Commercial rooftop solar →
Shops, hospitals, schools and colleges often use electricity during solar hours. Compare working-day and holiday loads. Export compensation, fixed charges and demand charges must be modelled separately.
Industrial rooftop solar →
Obtain interval meter data, sanctioned demand and transformer details. Review roof loading, evacuation protection, cable routes and shutdown windows before estimating a 100 kW or larger project.
Poultry farm solar →
Ventilation is a critical load. List fan, feeder, lighting and water-pump duties by hour. Retain a verified outage plan; an on-grid inverter normally disconnects when the grid fails.
Textile mill solar →
Separate process heat from electrical motor loads, and daytime production from night shifts. Dust and lint affect cleaning plans. Confirm safe access and roof corrosion before choosing module layouts.
Power loom solar →
Measure coincident motor loads rather than adding every nameplate rating. Motor starting and outage backup are separate design questions from annual energy offset.
Hybrid solar systems →
Specify which circuits require backup and for how long. Compare usable battery energy, inverter surge rating, changeover arrangements and battery replacement costs. Hybrid does not imply every load runs during an outage.
On-grid solar systems →
Grid-connected solar prioritises energy savings but is not a standalone backup supply. Obtain utility feasibility and approved metering before energisation. Do not assume exports are credited at the retail tariff.
Solar battery storage →
Size storage from critical kW × hours, adjusted for allowable discharge and conversion efficiency. Check temperature, fire precautions, ventilation and the manufacturer warranty conditions.
Solar AMC and maintenance →
Agree the inspection scope, cleaning method, fault response and exclusions in writing. Record inverter alarms, generation trends and insulation/protection tests. Cleaning frequency depends on the site.
Solar engineering and design consultancy →
A design package can include load assessment, string layout, single-line diagram, cable schedules, protection and yield study. Construction drawings require actual equipment data and site measurements.
Off-grid solar systems →
Use the worst relevant seasonal energy balance and battery autonomy rather than an annual average alone. Include generator or load-shedding arrangements when needed.
Ground-mounted solar plants →
Confirm land rights, drainage, flood risk, access, soil conditions and grid evacuation. Agricultural connection rules differ from household rooftop rules.
Solar site survey and feasibility →
Bring recent bills, sanctioned load and a roof plan. A useful survey records shading, dimensions, structural condition, earthing and cable routes before committing to equipment.
Solar subsidy application assistance →
Check household eligibility and vendor requirements on the official portal before installation. Assistance is not government approval or a guarantee of payment.
Solar loan application assistance →
Compare lender interest, fees, tenure, documentation and repayment ability. Loan sanction remains a bank decision; savings estimates are not guaranteed income.
EV charging installation →
Review charging power, connection capacity, protection and parking access. Solar energy and vehicle charging times may not coincide; grid and storage requirements need a separate assessment.
Subsidy & metering: verify before purchase
Residential, commercial and industrial eligibility differs. Unverified benefits are not deducted here. Subsidy approval, bank finance and a zero electricity bill are not guaranteed.
Solar Knowledge Centre
Solar planning questions
How much does rooftop solar cost?
Capacity, equipment, roof work and protection change the cost. Use the free estimate, then request an itemised site quotation.
Is subsidy available for every consumer?
No. Verify household eligibility on the official portal; do not apply residential assistance to commercial or industrial meters.
Does solar work during a power cut?
An ordinary on-grid system disconnects during an outage. Backup requires a suitably designed inverter, battery and protected circuits.
Planning to Install Solar in Tamil Nadu?
Request a personalized solar quotation for your site.
Free results remain available without sharing contact details. Enquiries are stored securely for solar project follow-up.